Monday 5 December 2011

Minutes Meeting 9

Members:

Joseph
Michael
Troy


This week we had a brief discussion about everything that we have done this past week and looked at all the things that are left to do. Michael is just running through all of the animation files making sure that all the cameras and lights match up to each other.
The curtains that were imported into the animation last week don’t work so Troy decided to create a set of curtains that will be used for the last part of the animation.
Once the curtains are done Joe and Michael can then put the curtains into the final section of the animation and then render it.
Once Michael has matched the cameras and lights up the scenes will then be ready to render.
Joe is going to gather a few background tracks that we may be able to use for our animation video.

Friday 2 December 2011

Week 6 Summary

This week I did a lot of little things to add finer detail to the animation files created last week. I added a number of items that needed putting in, including the toilet signs, projector, whiteboard and various pictures and also some wall textures such as plaster. I then sorted out the camera making the lens smaller and more zoomed out to allow the camera to take in more detail and not look so zoomed in. I decided not to add any bipeds, instead concentrating on the textures and lighting. With Michaels help we also got some lights into the animation, these just needs to be tweaked a little to make sure the shadows are cast properly. I also had to re-animate some of the files to make sure that all of the lights remained in the same place and also helped when putting the objects in.